Preparation of the Technical Supporting Report – ITS for the Modification of the Scope of the Environmental Management Instrument of the Wastewater Treatment Component at La Pampilla Refinery, located in the District of Ventanilla, Constitutional Province of Callao.

Cliente

TARIS S.A.

Fecha de Inicio

May of 2018

Fecha de Fin

July of 2018

Sinopsis

The purpose of this Technical Sustaining Report, hereinafter ITS, is to request environmental certification for the expansion of the Industrial Wastewater Treatment System, an expansion that will be of a temporary nature, as it will have the installation of a temporary and itinerant treatment system that will be removed at the end of approximately 5 months of operation and that will be intended solely and exclusively to provide treatment to a limited amount of wastewater with special characteristics (120,000 m3).

La Solución AMBIDES

Obtain environmental certification for the “Expansion of the Industrial Wastewater Treatment System of Refineria la Pampilla S.A.A.”





Do you have any doubt?

Do not hesitate to contact us!

Contact us
Ambides Soluciones Ambientales

Otros Proyectos

facebookSíguenos en Facebook instagramSíguenos en Instagram linkedinSíguenos en LinkedIn twitterSíguenos en Twitter youtubeSíguenos en YouTube tiktokSíguenos en TikTok
whatsapp