Inicio / Nuestros Proyectos / Elaboration of the technical file for the construction of a ditch for the Chilca Safety Landfill

Inicio / Nuestros Proyectos / Elaboration of the technical file for th...

2021

Elaboration of the technical file for the construction of a ditch for the Chilca Safety Landfill

Cliente

KANAY S.A.C

Fecha de Inicio

April of 2021

Fecha de Fin

May of 2021

Sinopsis

The company KANAY SAC, has an Environmental Management instrument that defines some environmental commitments, among them the construction of a ditch to intercept the rainwater, coming from the hill that borders with the Security Deposit N°1 and N°3, in the security landfill. In this regard, the company KANAY, wishes to implement this environmental commitment for which purpose it hired the services of the company AMBIDES SAC, to carry out the preparation of a Technical File for such infrastructure.

La Solución AMBIDES

Design of the ditch that will intercept the rainwater from the area of the Safety Deposits N°1 and N°3 of the Chilca Safety Landfill to divert it downstream.

Structure that will be used to intercept rainwater along the internal road that borders Safety Deposit N°1 and

the Safety Deposit N°1 and N°3 of the Chilca Safety Landfill, with a total length of 581.88 m (581.88 ft).

of 581.88 m.

The ditch was divided into 5 sections, which will have the same shape, but different dimensions.

different dimensions. The budget at direct cost is S/. 123, 347.84.





Do you have any doubt?

Do not hesitate to contact us!

Contact us
Ambides Soluciones Ambientales

Otros Proyectos

facebookSíguenos en Facebook instagramSíguenos en Instagram linkedinSíguenos en LinkedIn twitterSíguenos en Twitter youtubeSíguenos en YouTube tiktokSíguenos en TikTok
whatsapp